| Start of activity: |
| End of activity: |
| P&G employee responsible for the project: |
| Work coordinator for operation (name, signature): |
| Working on class 1 chemical system? |
| Does the contractor use chemicals (glue, paint, thineer etc.)? |
| Work on electrical equipment: |
| Required checklist: |
| Work at hight?: |
| Required qualifications: |
| Power off equipment? |
| Switching on the electric equipment: |
| Will the contractor come in contact with enzymes? |
| Use knife: |
| Required OOP |
| Required workplace security |
| Waste disposal |
| Risk |
| Safety and operational measures |