Start of activity: |
End of activity: |
P&G employee responsible for the project: |
Work coordinator for operation (name, signature): |
Working on class 1 chemical system? |
Does the contractor use chemicals (glue, paint, thineer etc.)? |
Work on electrical equipment: |
Required checklist: |
Work at hight?: |
Required qualifications: |
Power off equipment? |
Switching on the electric equipment: |
Will the contractor come in contact with enzymes? |
Use knife: |
Required OOP |
Required workplace security |
Waste disposal |
Risk |
Safety and operational measures |